Throughout this project, the students will construct a kitchen pot holder. This project will take about six to seven days (45-minute class periods, with 22 students) for students to complete. Everyday, students will begin with setting up their sewing machines and setting goals for the day. Students will follow the written and video instructions to complete the project. At the end of each day, students will reflect upon what they accomplished and what they hope to improve upon for the following day. As there are written and video instructions, students can move through the project at their own pace. This project works well for middle school (specifically 6th grade) or as a project to refresh students on how to use the sewing machine and construction terminology in high school.
- Subject:
- Architecture and Design
- Career and Technical Education
- Material Type:
- Lesson Plan
- Author:
- Audrey Foster
- Date Added:
- 07/02/2023